Community Hub | Kildress Wolfe Tones GAC

Looking back at our work 4 years on.

Built in 2021 – This purpose-built hub for Kildress Wolfe Tones GAC continues to deliver—serving sport, meetings, events, and more with the same strength, comfort, and functionality we designed it for.

From its sports hall and gym to the conference spaces, changing rooms, kitchen, and balcony, every part of this facility was built to last. And it has.

We are proud to have built a space that still looks the part and serves the heart of the Kildress community.

   Key features include:

✅ Main foyer and entrance

✅ Kitchen and Bathroom facilities

✅ Full-size sports hall

✅ Gymnasium

✅ Four changing room suites

✅ Upper-floor conference room

✅ Business meeting suites

✅ Balcony covered viewing area

This project involved on site new build community building and associated site works. The project involved site clearance, provision of foundations, installation of aluminium windows and doors, complete installation of mechanical and electrical systems, and all floor and ceiling finishes and associated external and site works.

The external skin of the building was was clad with kingspan insulated panels, aluminium windows and aluminium powder coated external doors. Internally walls were plastered and then painted as per the clients recommendations. 

Post-Construction Image - 2021.

Floors were finished in carpet tiles to meeting areas, tiled flooring to main entrance areas and toilets, wooden sports flooring to hall areas and non-slip sports safety vinyl flooring to changing rooms. The ceilings were completed with suspended ceiling grid and tiles. A complete specialist mechanical and electrical system was installed throughout the buildings. This consisted of new lighting, fire alarm, intruder alarm and door entry systems. Toilets and wash hand basins were fitted to all toilet areas along with new cubicles, vanity units and IPS’s. Site works included erection of new car park areas, fencing, alterations to the drainage and provision of a balcony covered viewing area.

The construction of a new build community building and associated site works for Kildress GAC is perhaps one of our most successful projects. It is an example of a project outside of our standard practice and demonstrated our flexibility and adaptability to any modular project that we are presented with.

Need a faster, more flexible way to build education spaces?

JDC Building Works delivers modular solutions that meet your needs for quality, speed, and minimal disruption.

📩 Let’s talk about your next project — Contact Us today to get started.

More Projects